South Africa (NRS 097 / RPP) — ride-through requirements
The LVRT, HVRT, FRT envelopes a grid-scale battery must meet under South Africa (NRS 097 / RPP) (South Africa), digitized breakpoint by breakpoint and checked against the clause it came from.
Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.
What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.
Breakpoints
Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries.
| Event | Duty | Breakpoints | Status |
|---|---|---|---|
| low-voltage ride-through (LVRT) | ride-through | 0.001s → 0 pu; 0.15s → 0 pu; 0.151s → 0.053 pu; 0.381s → 0.159 pu; 0.613s → 0.266 pu; 0.844s → 0.372 pu; 1.075s → 0.478 pu; 1.306s → 0.584 pu; 1.538s → 0.691 pu; 1.769s → 0.797 pu; 2s → 0.85 pu; 20s → 0.85 pu; 20.001s → 0.9 pu | verified |
| high-voltage ride-through (HVRT) | ride-through | 0.001s → 1.2 pu; 2s → 1.2 pu; 2.001s → 1.1 pu | verified |
| frequency ride-through (FRT) | ride-through | High: 0.2s → 52 Hz; 4s → 52 Hz; 4.001s → 51.5 Hz; 60s → 51.5 Hz; 60.001s → 51 Hz | Low: 0.2s → 47 Hz; 6s → 47 Hz; 6.001s → 47.5 Hz; 10s → 47.5 Hz; 10.001s → 48 Hz; 60s → 48 Hz; 60.001s → 49 Hz | verified |
Where these values come from
- LVRT Grid Connection Code for Renewable Power Plants (RPPs) connected to the Electricity Transmission or Distribution System in South Africa, Version 3.1, January 2022 - clause 5.2.1(b)(3) 'withstand voltage drops to zero ... for a minimum period of 0.150 seconds' and Figure 4 'Voltage Ride through Capability for the RPPs of Category A3, B and C utilising non-synchronous machines' (time axis breakpoints 0.0 / 0.15 / 2.0 / 4.0 / 20.0 s; 85% level marked).
- HVRT Grid Connection Code for RPPs in South Africa, Version 3.1, January 2022, clause 5.2.1(b)(4) and Figure 4 Area D (p.16); Umax from Table 1 (p.12).
- FRT SA RPP Grid Code v3.1 (Jan 2022), clause 5.1(5) 'When the frequency on the NIPS is higher than 51.5 Hz for longer than 4 seconds, the RPP shall be disconnected' and Figure 2 'Minimum frequency operating range of a RPP (during a system frequency disturbance)' - upper boundary steps at 4 s (52 -> 51.5) and 60 s (51.5 -> 51.0); continuous range 49.0-51.0 Hz.
Last checked against the source document on .
Other grid codes in Africa
- Kenya (KNTGC VRPP) Kenya · FRT, HVRT, LVRT
- Morocco (CRENT) Morocco · FRT, HVRT
- Nigeria (TCN Grid Code) Nigeria · FRT, HVRT, LVRT