High-voltage ride-through (HVRT) compared across 33 grid codes

HVRT is an upper boundary: stay connected while voltage is on or below it. This page puts every HVRT envelope in the dataset side by side — 33 codes across 24 countries — with the clause each one was read from. 20 more countries in the dataset carry no HVRT row, and this page separates the ones checked and found to define none from the ones nobody has established either way.

Part of: the grid-code ride-through chart — 66 standards in 44 countries, across all three events.

What this is, and is not. A reading aid compiled from the clauses cited in each row — not a compliance document. The primary text governs, and a code can bind a plant through requirements this envelope does not show. Every value is reproduced from the standard's own page, linked in the first column.

Every HVRT envelope in the dataset

Highest withstand voltage is the highest point on the published envelope — the largest over-voltage the code requires a plant to withstand. It is read off the breakpoints in the same row, not quoted from the code, so treat it as a way to sort the table rather than as a value to put in a specification — the breakpoints are the published figure. Times are seconds from the start of the disturbance.

high-voltage ride-through envelopes from 33 grid codes, with the deepest or highest point of each and its verification status
Grid codeCountryHighest withstand voltageBreakpointsStatus
Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1)Argentina1.2 pu0.001s → 1.2 pu; 0.12s → 1.2 pu; 0.121s → 1.1 pu; 1200s → 1.1 pu; 1200.001s → 1.05 puverified
Australia (NER / AEMO)Australia1.3 pu0.001s → 1.3 pu; 0.2s → 1.3 pu; 0.201s → 1.25 pu; 2s → 1.25 pu; 2.001s → 1.2 pu; 20s → 1.2 pu; 20.001s → 1.15 pu; 1200s → 1.15 pu; 1200.001s → 1.1 puverified
Brazil (ONS Submódulo 2.10)Brazil1.2 pu0.001s → 1.2 pu; 2.5s → 1.2 pu; 2.501s → 1.1 puverified
California Rule 21US1.2 pu0.001s → 1.2 pu; 12s → 1.2 pu; 12.001s → 1.1 puverified
Canada (Alberta AESO)Canada1.2 pu0.001s → 1.2 pu; 0.2s → 1.2 pu; 0.201s → 1.175 pu; 0.5s → 1.175 pu; 0.501s → 1.15 pu; 1s → 1.15 pu; 1.001s → 1.1 puverified
Chile (NTSyCS)Chile1.2 pu0.001s → 1.2 pu; 1s → 1.2 pu; 1.001s → 1.1 puverified
China (GB/T 36547-2024)China1.3 pu0.001s → 1.3 pu; 0.5s → 1.3 pu; 0.501s → 1.25 pu; 1s → 1.25 pu; 1.001s → 1.2 pu; 10s → 1.2 pu; 10.001s → 1.1 puverified
Colombia (CREG 060/2019, red de 500 kV)Colombia1.2 pu0.001s → 1.2 pu; 2s → 1.2 pu; 2.001s → 1.05 puverified
Colombia (CREG 060/2019)Colombia1.2 pu0.001s → 1.2 pu; 2s → 1.2 pu; 2.001s → 1.1 puverified
ERCOT (NOG 2.9.1.2 legacy)US1.2 pu0.001s → 1.2 pu; 0.2s → 1.2 pu; 0.201s → 1.175 pu; 0.5s → 1.175 pu; 0.501s → 1.15 pu; 1s → 1.15 pu; 1.001s → 1.1 puverified
ERCOT (NOG 2.9.1)US1.2 pu0.001s → 1.2 pu; 1s → 1.2 pu; 1.001s → 1.1 puverified
Finland (Fingrid VJV2024)Finland1.2 pu0.001s → 1.2 pu; 5s → 1.2 pu; 5.001s → 1.1 puverified
Germany (VDE-AR-N 4120, draft summary)Germany1.3 pu0.001s → 1.3 pu; 0.1s → 1.3 pu; 0.101s → 1.25 pu; 60s → 1.25 pu; 60.001s → 1.15 pupartial
IEEE 1547-2018 Cat IIIUS1.2 pu0.001s → 1.2 pu; 12s → 1.2 pu; 12.001s → 1.1 puverified
IEEE 2800-2022US1.2 pu0.001s → 1.2 pu; 1s → 1.2 pu; 1.001s → 1.1 puverified
India (CEA Connectivity Regs)India1.3 pu0.001s → 1.3 pu; 0.2s → 1.3 pu; 0.201s → 1.2 pu; 2s → 1.2 pu; 2.001s → 1.1 puverified
Italy (TERNA)Italy1.3 pu0.001s → 1.3 pu; 0.1s → 1.2 pu; 1s → 1.15 puverified
Kenya (KNTGC VRPP)Kenya1.2 pu0.001s → 1.2 pu; 2s → 1.2 pu; 2.001s → 1.1 puverified
Mexico (Codigo de Red)Mexico1.3 pu0.001s → 1.3 pu; 0.2s → 1.3 pu; 0.201s → 1.1 puverified
Morocco (CRENT)Morocco1.2 pu0.001s → 1.2 pu; 20s → 1.2 pu; 20.001s → 1.15 pupartial
NERC PRC-024-4 (no-trip)US1.2 pu0.001s → 1.2 pu; 0.2s → 1.2 pu; 0.201s → 1.175 pu; 0.5s → 1.175 pu; 0.501s → 1.15 pu; 1s → 1.15 pu; 1.001s → 1.1 puverified
NERC PRC-029-1 (IBR)US1.2 pu0.001s → 1.2 pu; 1s → 1.2 pu; 1.001s → 1.1 pu; 1800s → 1.1 pu; 1800.001s → 1.05 puverified
New Zealand (EIPC cl 8.25A)New Zealand1.2 pu0.001s → 1.2 pu; 2s → 1.2 pu; 2.001s → 1.15 pu; 6s → 1.15 pu; 6.001s → 1.1 puverified
Nigeria (TCN Grid Code)Nigeria1.2 pu0.001s → 1.2 pu; 2s → 1.2 pu; 2.001s → 1.1 pupartial
Panama (Código de Redes Fotovoltaico 2017)Panama1.2 pu0.001s → 1.2 pu; 2.2s → 1.2 pu; 2.201s → 1.1 pupartial
Quebec (Hydro-Quebec D-2022-088)Canada1.4 pu0.001s → 1.4 pu; 0.1s → 1.4 pu; 0.101s → 1.25 pu; 2s → 1.25 pu; 2.001s → 1.2 pu; 30s → 1.2 pu; 30.001s → 1.15 pu; 300s → 1.15 pu; 300.001s → 1.1 puverified
Saudi Arabia (SAGC)Saudi Arabia1.2 pu0.001s → 1.2 pu; 1s → 1.2 pu; 1.001s → 1.1 puverified
South Africa (NRS 097 / RPP)South Africa1.2 pu0.001s → 1.2 pu; 2s → 1.2 pu; 2.001s → 1.1 puverified
South Korea (KEPCO)South Korea1.2 pu0.001s → 1.2 pu; 0.2s → 1.2 pu; 0.201s → 1.1 puverified
Spain (P.O. 12.3)Spain1.2 pu0.001s → 1.2 pu; 0.05s → 1.2 pu; ↗ 1s → 1.15 puverified
Taiwan (TPC)Taiwan1.2 pu0.001s → 1.2 pu; 0.25s → 1.2 pu; 0.251s → 1.15 pu; 1s → 1.15 pu; 1.001s → 1.1 puverified
Transient overvoltage (IEEE 2800 TOV)US1.8 pu0.0001s → 1.8 pu; 0.0002s → 1.8 pu; 0.00021s → 1.7 pu; 0.001s → 1.7 pu; 0.00101s → 1.6 pu; 0.003s → 1.6 pu; 0.00301s → 1.4 pu; 0.015s → 1.4 pu; 0.0151s → 1.2 puverified
Vietnam BESS (Circular 05/2025/TT-BCT Art. 44)Vietnam1.2 pu0.001s → 1.2 pu; 0.5s → 1.2 pu; 0.501s → 1.15 pu; 3s → 1.15 pu; 3.001s → 1.1 puverified

Last checked against the source documents on .

Countries with no HVRT envelope here

20 countries appear in this dataset for another event but carry no HVRT row. Those are two different situations, and conflating them would turn a research backlog into a claim — so they are separated.

Checked — the code defines no HVRT envelope

Read and found to contain no HVRT voltage-versus-time envelope. Treat any HVRT figure quoted to you for these markets as unsourced until someone shows you the clause it came from.

France · Ireland · Netherlands · UK

Not established either way

No HVRT row here, and no finding that the code lacks one. The honest statement is that we have not established it — go to the code itself rather than reading this list as evidence of absence.

Austria · Belgium · Denmark · Ecuador · Greece · Malaysia · Norway · Peru · Philippines · Poland · Romania · Singapore · Sri Lanka · Sweden · Switzerland · Turkey

The reasoning for every checked absence, code by code, is on the grid codes with no ride-through curve.

The other two obligations