Spain (P.O. 12.3) — ride-through requirements

The LVRT, HVRT envelopes a grid-scale battery must meet under Spain (P.O. 12.3) (Spain), digitized breakpoint by breakpoint and checked against the clause it came from.

Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.

What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.

Breakpoints

Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries.

Event Duty Breakpoints Status
low-voltage ride-through (LVRT) ride-through 0.001s → 0 pu; 0.15s → 0 pu; 0.3s → 0.094 pu; 0.45s → 0.189 pu; 0.6s → 0.283 pu; 0.75s → 0.378 pu; 0.9s → 0.472 pu; 1.05s → 0.567 pu; 1.2s → 0.661 pu; 1.35s → 0.756 pu; 1.5s → 0.85 pu verified
high-voltage ride-through (HVRT) ride-through 0.001s → 1.2 pu; 0.05s → 1.2 pu; 0.24s → 1.19 pu; 0.43s → 1.18 pu; 0.62s → 1.17 pu; 0.81s → 1.16 pu; 1s → 1.15 pu verified

Where these values come from

  • LVRT Orden TED/749/2020, Anexo I, ap. 3.1.1 d) y Figura 16 (BOE-A-2020-8965, pág. 62432), still current after Orden TED/82/2026 which only rewrote ap. 3.1.1 b)/Figura 14 for modules <110 kV; legacy P.O. 12.3 Figura 4.1, BOE-A-2006-18485 (ree.es PO_resol_12.3_Respuesta_huecos_eolica.pdf).
  • HVRT Orden TED/749/2020, Anexo I, ap. 3.3.3 y Figura 19 (BOE-A-2020-8965, pág. 62436); Vmax from Tabla 2 (0.90–1.118 pu unlimited, 1.118–1.15 pu 60 min at 110–300 kV) and Tabla 3 (1.0875–1.10 pu at 300–400 kV).

Last checked against the source document on .