Greece (ADMIE/IPTO RfG) — ride-through requirements
The LVRT, FRT envelopes a grid-scale battery must meet under Greece (ADMIE/IPTO RfG), digitized breakpoint by breakpoint and checked against the clause it came from.
Applies to: both connections — PGMs types A-D under the Greek RfG general requirements.
Part of: the grid-code ride-through chart — compare this against 65 other standards in 44 countries.
What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.
Breakpoints
Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries. These are the boundaries, not the behaviour: what holding one demands of the converter — reactive current injection, thermal stress, protection timing — is stepped through in the LVRT / HVRT ride-through visual.
| Event | Duty | Breakpoints | Status |
|---|---|---|---|
| low-voltage ride-through (LVRT) | ride-through | 0.001s → 0 pu; 0.15s → 0 pu; ↗ 1.5s → 0.85 pu; 3s → 0.85 pu | verified |
| frequency ride-through (FRT) | ride-through | High: 0.1s → 51.5 Hz; 1800s → 51.5 Hz; 1800.001s → 51 Hz | Low: 0.1s → 47.5 Hz; 1800s → 47.5 Hz; 1800.001s → 49 Hz | verified |
Where these values come from
- LVRTΑπόφαση ΡΑΕ 1165/2020 (ΦΕΚ Β' 3757, 07.09.2020), Άρθρο 16 §3(α), Εικ. 4 + Πίνακας Κ — verified in the official ADMIE-hosted PDF (ΑΔΑ: 624ΔΙΔΞ-ΤΡΡ), 37 pp. The code defines a linear recovery ramp; the vertices are read from the clause and the chart draws the segment between them.
- FRTΑπόφαση ΡΑΕ 1165/2020 (ΦΕΚ Β' 3757, 07.09.2020), Άρθρο 13 §1(α) στοιχείο (i), Πίνακας 2 'Εύρη τιμών συχνότητας συστήματος και ελάχιστες χρονικές διάρκειες παραμονής σε λειτουργία'.
Any event not in the table above is not plotted for this code. Where an absence is itself the finding — a code that defines no high-voltage envelope, or one whose curves circulate under another country's name — it is recorded in the grid codes with no ride-through curve.
Last checked against the source document on .
How Greece compares
Each event this code defines, put side by side with every other code that defines it:
- Low-voltage ride-through (LVRT) across 52 codesWhere Greece (ADMIE/IPTO RfG) sits against every other published LVRT envelope.
- Frequency ride-through (FRT) across 45 codesWhere Greece (ADMIE/IPTO RfG) sits against every other published FRT envelope.
Other grid codes in Europe
- Austria (E-Control TOR Typ D)Austria · FRT, LVRT
- Belgium (Federal Grid Code)Belgium · FRT, LVRT
- Denmark (TR 3.3.1)Denmark · FRT, LVRT
- Finland (Fingrid VJV2024)Finland · FRT, HVRT, LVRT
- France (RTE)France · LVRT
- Germany (VDE-AR-N 4120, draft summary)Germany · HVRT, FRT
- Ireland (EirGrid)Ireland · LVRT
- Italy (TERNA)Italy · HVRT, LVRT
- Netherlands (TenneT)Netherlands · LVRT
- Norway (Statnett NVF 2025)Norway · FRT, LVRT
- Poland (PSE Wymogi 2025)Poland · LVRT
- Romania (Transelectrica/ANRE storage norm)Romania · FRT, LVRT