Denmark (TR 3.3.1) — ride-through requirements
The LVRT, FRT envelopes a grid-scale battery must meet under Denmark (TR 3.3.1) (Denmark), digitized breakpoint by breakpoint and checked against the clause it came from.
Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.
What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.
Breakpoints
Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries.
| Event | Duty | Breakpoints | Status |
|---|---|---|---|
| low-voltage ride-through (LVRT) | ride-through | 0.001s → 0 pu; 0.15s → 0 pu; 0.3s → 0.094 pu; 0.45s → 0.189 pu; 0.6s → 0.283 pu; 0.75s → 0.378 pu; 0.9s → 0.472 pu; 1.05s → 0.567 pu; 1.2s → 0.661 pu; 1.35s → 0.756 pu; 1.5s → 0.85 pu | verified |
| frequency ride-through (FRT) | ride-through | High: 0.1s → 51.5 Hz; 1800s → 51 Hz | Low: 0.1s → 47.5 Hz; 1800s → 48.5 Hz; 3600s → 49 Hz | verified |
Where these values come from
- LVRT Energinet Technical Regulation 3.3.1 – Revision 6 (14 Feb 2025, effective 1 May 2025), Part 16, section 128(1) and Table 45 (DK1); section 129(1) and Table 46 (DK2); cf. sections 90/114 Tables 39/40/43/44 for distribution-connected categories.
- FRT Energinet Technical Regulation 3.3.1 – Revision 6, Tables 30/32/34/36 (normal frequency operating range, transmission-connected, DK1 and DK2: 47.5–48.5 or 47.5–48.0 / 30 min, 48.5–49.0 or 48.0–49.0 / 30 min, 49.0–51.0 unlimited, 51.0–51.5 / 30 min) and section 68(1)/69(1) proviso on 60 minutes below 49.00 Hz; protection settings f< 47.5 Hz / 200 ms and f> 51.5 Hz / 200 ms are separate trip settings.
Last checked against the source document on .
Other grid codes in Europe
- Austria (E-Control TOR Typ D) Austria · FRT, LVRT
- Belgium (Federal Grid Code) Belgium · FRT, LVRT
- Finland (Fingrid VJV2024) Finland · FRT, HVRT, LVRT
- France (RTE) France · LVRT
- Greece (ADMIE/IPTO RfG) Greece · FRT, LVRT
- Ireland (EirGrid) Ireland · LVRT
- Italy (TERNA) Italy · HVRT, LVRT
- Netherlands (TenneT) Netherlands · LVRT
- Norway (Statnett NVF 2025) Norway · FRT, LVRT
- Poland (PSE Wymogi 2025) Poland · LVRT
- Romania (Transelectrica/ANRE storage norm) Romania · FRT, LVRT
- Spain (P.O. 12.3) Spain · HVRT, LVRT