Italy (TERNA) — ride-through requirements
The LVRT, HVRT envelopes a grid-scale battery must meet under Italy (TERNA) (Italy), digitized breakpoint by breakpoint and checked against the clause it came from.
Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.
What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.
Breakpoints
Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries.
| Event | Duty | Breakpoints | Status |
|---|---|---|---|
| low-voltage ride-through (LVRT) | ride-through | 0.001s → 0 pu; 0.2s → 0 pu; 0.4s → 0.094 pu; 0.6s → 0.189 pu; 0.8s → 0.283 pu; 1s → 0.378 pu; 1.2s → 0.472 pu; 1.4s → 0.567 pu; 1.6s → 0.661 pu; 1.8s → 0.756 pu; 2s → 0.85 pu | verified |
| high-voltage ride-through (HVRT) | ride-through | 0.001s → 1.3 pu; 0.1s → 1.2 pu; 1s → 1.15 pu | verified |
Where these values come from
- LVRT Terna Allegato A.79 Rev. 00, Marzo 2023, §6.4 'Insensibilità alle variazioni di tensione', Fig. 1 'Caratteristica FRT per Impianti di Accumulo' and Tabella 1 'Parametri FRT' (tA = 200 ms; tB = 2 s / 2,8 s / 4 s); same values in the June 2022 consultation text (Tabella 2).
- HVRT Terna Allegato A.79 Rev. 00, Marzo 2023, Fig. 1 'Caratteristica FRT per Impianti di Accumulo' (curva OVRT: 1,3 / 1,2 / 1,15 pu with footnote '1,1 se il punto di connessione è a tensione superiore o uguale 300 kV') and Tabella 1 (tC = 100 ms, tD = 1 s).
Last checked against the source document on .
Other grid codes in Europe
- Austria (E-Control TOR Typ D) Austria · FRT, LVRT
- Belgium (Federal Grid Code) Belgium · FRT, LVRT
- Denmark (TR 3.3.1) Denmark · FRT, LVRT
- Finland (Fingrid VJV2024) Finland · FRT, HVRT, LVRT
- France (RTE) France · LVRT
- Greece (ADMIE/IPTO RfG) Greece · FRT, LVRT
- Ireland (EirGrid) Ireland · LVRT
- Netherlands (TenneT) Netherlands · LVRT
- Norway (Statnett NVF 2025) Norway · FRT, LVRT
- Poland (PSE Wymogi 2025) Poland · LVRT
- Romania (Transelectrica/ANRE storage norm) Romania · FRT, LVRT
- Spain (P.O. 12.3) Spain · HVRT, LVRT