Finland (Fingrid VJV2024) — ride-through requirements
The LVRT, HVRT, FRT envelopes a grid-scale battery must meet under Finland (Fingrid VJV2024) (Finland), digitized breakpoint by breakpoint and checked against the clause it came from.
Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.
What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.
Breakpoints
Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries.
| Event | Duty | Breakpoints | Status |
|---|---|---|---|
| low-voltage ride-through (LVRT) | ride-through | 0.001s → 0 pu; 0.2s → 0 pu; 0.53s → 0.21 pu; 0.85s → 0.43 pu; 1.18s → 0.64 pu; 1.5s → 0.85 pu; 10s → 0.85 pu; 10.001s → 0.9 pu | verified |
| high-voltage ride-through (HVRT) | ride-through | 0.001s → 1.2 pu; 5s → 1.2 pu; 5.001s → 1.1 pu | verified |
| frequency ride-through (FRT) | ride-through | High: 0.1s → 51.5 Hz; 1800s → 51.5 Hz; 1800s → 51 Hz | Low: 0.1s → 47.5 Hz; 1800s → 47.5 Hz; 1800s → 49 Hz | verified |
Where these values come from
- LVRT Fingrid, 'Grid Code Specifications for Power Generating Facilities VJV2024', unofficial English translation dated 15.1.2025 - section 10.5.3, Figure 10.10 (type D power park modules), p. 63.
- HVRT Fingrid, 'Grid Code Specifications for Power Generating Facilities VJV2024', unofficial English translation dated 15.1.2025 - section 10.3.3 'Overvoltage withstand capability', Figure 10.4 (p. 48), extended by section 10.5.5.
- FRT Fingrid, 'Grid Code Specifications for Power Generating Facilities VJV2024', unofficial English translation dated 15.1.2025 - section 10.5.2, Figure 10.7 (p. 60).
Last checked against the source document on .
Other grid codes in Europe
- Austria (E-Control TOR Typ D) Austria · FRT, LVRT
- Belgium (Federal Grid Code) Belgium · FRT, LVRT
- Denmark (TR 3.3.1) Denmark · FRT, LVRT
- France (RTE) France · LVRT
- Greece (ADMIE/IPTO RfG) Greece · FRT, LVRT
- Ireland (EirGrid) Ireland · LVRT
- Italy (TERNA) Italy · HVRT, LVRT
- Netherlands (TenneT) Netherlands · LVRT
- Norway (Statnett NVF 2025) Norway · FRT, LVRT
- Poland (PSE Wymogi 2025) Poland · LVRT
- Romania (Transelectrica/ANRE storage norm) Romania · FRT, LVRT
- Spain (P.O. 12.3) Spain · HVRT, LVRT