Poland (PSE Wymogi 2025) — ride-through requirements
The LVRT envelope a grid-scale battery must meet under Poland (PSE Wymogi 2025) (Poland), digitized breakpoint by breakpoint and checked against the clause it came from.
Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.
What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.
Breakpoints
Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries.
| Event | Duty | Breakpoints | Status |
|---|---|---|---|
| low-voltage ride-through (LVRT) | ride-through | 0.001s → 0 pu; 0.15s → 0 pu; 0.74s → 0.21 pu; 1.33s → 0.43 pu; 1.91s → 0.64 pu; 2.5s → 0.85 pu | verified |
Where these values come from
- LVRT PSE S.A., 'Wymogi ogolnego stosowania wynikajace z Rozporzadzenia Komisji (UE) 2016/631 (NC RfG) - Maj 2025 r.' (Wymogi 2025), approved by URE decision DRE.WKP.744.18.15.2024.WZ.MKo4 of 15.05.2025 - Art. 16(3)(a)(i), Table 12 + Figure 7 (power park modules, type D); identical set at Art. 16(3)(c), Table 14 for asymmetrical faults.
Last checked against the source document on .
Other grid codes in Europe
- Austria (E-Control TOR Typ D) Austria · FRT, LVRT
- Belgium (Federal Grid Code) Belgium · FRT, LVRT
- Denmark (TR 3.3.1) Denmark · FRT, LVRT
- Finland (Fingrid VJV2024) Finland · FRT, HVRT, LVRT
- France (RTE) France · LVRT
- Greece (ADMIE/IPTO RfG) Greece · FRT, LVRT
- Ireland (EirGrid) Ireland · LVRT
- Italy (TERNA) Italy · HVRT, LVRT
- Netherlands (TenneT) Netherlands · LVRT
- Norway (Statnett NVF 2025) Norway · FRT, LVRT
- Romania (Transelectrica/ANRE storage norm) Romania · FRT, LVRT
- Spain (P.O. 12.3) Spain · HVRT, LVRT