France (RTE) — ride-through requirements

The LVRT envelope a grid-scale battery must meet under France (RTE) (France), digitized breakpoint by breakpoint and checked against the clause it came from.

Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.

What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.

Breakpoints

Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries.

Event Duty Breakpoints Status
low-voltage ride-through (LVRT) ride-through 0.001s → 0 pu; 0.15s → 0 pu; 0.3s → 0.094 pu; 0.45s → 0.189 pu; 0.6s → 0.283 pu; 0.75s → 0.378 pu; 0.9s → 0.472 pu; 1.05s → 0.567 pu; 1.2s → 0.661 pu; 1.35s → 0.756 pu; 1.5s → 0.85 pu verified

Where these values come from

  • LVRT RTE Documentation Technique de Référence, Chapitre 5, Article 5.1.1 (version 1.2, applicable 03/08/2020), §4.6.1, Figure 10 'Gabarit creux de tension unité PPM type D' (axes 0 / 150 / 1500 ms, 0 % / 85 % / 100 % Un); implements arrêté du 9 juin 2020 / Règlement (UE) 2016/631 art. 16.

Last checked against the source document on .