ERCOT (NOG 2.9.1) — ride-through requirements
The LVRT, HVRT envelopes a grid-scale battery must meet under ERCOT (NOG 2.9.1) (US), digitized breakpoint by breakpoint and checked against the clause it came from.
Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.
What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.
Breakpoints
Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries.
| Event | Duty | Breakpoints | Status |
|---|---|---|---|
| low-voltage ride-through (LVRT) | ride-through | 0.001s → 0 pu; 0.32s → 0 pu; 0.321s → 0.096 pu; 0.4s → 0.141 pu; 0.48s → 0.186 pu; 0.56s → 0.231 pu; 0.594s → 0.25 pu; 1.2s → 0.25 pu; 1.201s → 0.5 pu; 3s → 0.5 pu; 3.001s → 0.7 pu; 6s → 0.7 pu; 6.001s → 0.9 pu | verified |
| high-voltage ride-through (HVRT) | ride-through | 0.001s → 1.2 pu; 1s → 1.2 pu; 1.001s → 1.1 pu | verified |
Where these values come from
- LVRT ERCOT Nodal Operating Guides, Section 2.9.1.1 'Preferred Voltage Ride-Through Requirements for Transmission-Connected Inverter-Based Resources (IBRs)', paragraph (1), Table B: Applicable to PhotoVoltaic Generation Resources (PVGRs) and ESR IBRs, plus the following paragraph defining the sub-0.25 pu straight-line function ('0.15 seconds at zero voltage and 1.75 seconds at 0.9 p.u. voltage'). Source: February 1, 2026 ERCOT Nodal Operating Guide PDF (body dated DECEMBER 5, 2025), sheet pp. 52-54.
- HVRT ERCOT Nodal Operating Guides Section 2.9.1(1)(a)/(b) (applicability by SGIA date, no MW threshold); Section 2.9.1.1(1) Tables A and B high-voltage rows (1.10<V<=1.20 -> 1.0 s; V>1.20 may ride-through or trip); Section 2.9.1.2(1) Table A (1.175<V<=1.2 -> 0.2 s; 1.15<V<=1.175 -> 0.5 s; 1.10<V<=1.15 -> 1.0 s). sheets pp. 50-55.
Last checked against the source document on .
Other grid codes in North America
- California Rule 21 US · FRT, HVRT, LVRT
- Canada (Alberta AESO) Canada · FRT, HVRT, LVRT
- ERCOT (NOG 2.6.2.1) US · FRT
- ERCOT (NOG 2.9.1.2 legacy) US · HVRT, LVRT
- IEEE 1547-2018 Cat III US · FRT, HVRT, LVRT
- IEEE 2800-2022 US · FRT, HVRT, LVRT
- Mexico (Codigo de Red) Mexico · FRT, HVRT, LVRT
- NERC PRC-024-4 (ERCOT) US · FRT
- NERC PRC-024-4 (no-trip) US · HVRT, LVRT
- NERC PRC-024-4 (Western) US · FRT
- NERC PRC-029-1 (IBR) US · FRT, HVRT, LVRT
- NERC PRC-029-1 (Table 1: AC-connected wind IBR /…) US · LVRT