Chile (NTSyCS) — ride-through requirements
The LVRT, HVRT envelopes a grid-scale battery must meet under Chile (NTSyCS) (Chile), digitized breakpoint by breakpoint and checked against the clause it came from.
Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.
What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.
Breakpoints
Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries.
| Event | Duty | Breakpoints | Status |
|---|---|---|---|
| low-voltage ride-through (LVRT) | ride-through | 0.001s → 0 pu; 0.14s → 0 pu; 0.141s → 0.067 pu; 0.283s → 0.2 pu; 0.427s → 0.333 pu; 0.57s → 0.467 pu; 0.713s → 0.6 pu; 0.857s → 0.733 pu; 1s → 0.8 pu | verified |
| high-voltage ride-through (HVRT) | ride-through | 0.001s → 1.2 pu; 1s → 1.2 pu; 1.001s → 1.1 pu | verified |
Where these values come from
- LVRT CNE Anexo Tecnico 'Exigencias Minimas de Instalaciones Basadas en Convertidores que se Conecten al SEN' (Res. Ex. 45, 28-01-2026), Art. 3-1(i) + Figura 1 (IBR GFM) and Art. 4-1(b) + Figura 2 (IBR GFL): T0 = 0 ms, T1 = max fault-clearing time per Art. 5-40 NTSyCS, T2 = T1 + 20 ms, T3 = 1000 ms, recovery boundary 0.80 pu. NTSyCS Art. 5-40: 120 ms for >= 200 kV, 400 ms for < 200 kV. Same shape as the superseded NTSyCS Art. 3-7.
- HVRT CNE Anexo Tecnico IBR (Res. Ex. 45, 28-01-2026), Art. 3-1(i) for IBR GFM and Art. 4-1(b) for IBR GFL: 'En caso de sobretensiones mayores a 1,1 y menores o iguales a 1,2 por unidad, la IBR ... debera operar de manera continua e ininterrumpida durante al menos 1 segundo.'.
Last checked against the source document on .
Other grid codes in South America
- Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1 Argentina · HVRT, LVRT
- Argentina (CAMMESA PT-4) Argentina · FRT
- Brazil (PRODIST / ONS) Brazil · FRT, HVRT, LVRT
- Colombia (CREG 060/2019, red de 500 kV) Colombia · HVRT
- Colombia (CREG 060/2019) Colombia · HVRT, LVRT
- Ecuador (ARCONEL-001/24 Código de Conexión) Ecuador · FRT, LVRT
- Panama (Código de Redes Fotovoltaico 2017) Panama · FRT, HVRT, LVRT
- Peru (COES PR-20, Anexo 1 Cap. 4 Peru · FRT, LVRT