Ecuador (ARCONEL-001/24 Código de Conexión) — ride-through requirements

The LVRT, FRT envelopes a grid-scale battery must meet under Ecuador (ARCONEL-001/24 Código de Conexión), digitized breakpoint by breakpoint and checked against the clause it came from.

Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.

What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.

Breakpoints

Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries. These are the boundaries, not the behaviour: what holding one demands of the converter — reactive current injection, thermal stress, protection timing — is stepped through in the LVRT / HVRT ride-through visual.

EventDutyBreakpointsStatus
low-voltage ride-through (LVRT)ride-through0.001s → 0 pu; 0.25s → 0 pu; 0.251s → 0.25 pu; ↗ 1.5s → 0.85 pu; 3600s → 0.85 puverified
frequency ride-through (FRT)ride-throughHigh: 0.1s → 63 Hz; 90s → 63 Hz; 90.001s → 62 Hz; 1800s → 62 Hz; 1800.001s → 61 Hz | Low: 0.1s → 57.5 Hz; 90s → 57.5 Hz; 90.001s → 58 Hz; 1800s → 58 Hz; 1800.001s → 59 Hzverified

Where these values come from

  • LVRTRegulación Nro. ARCONEL-001/24 «Código de Conexión del Sistema Eléctrico Ecuatoriano» (expedida por Resolución ARCONEL-003/2024, Sesión de Directorio de 04 de septiembre de 2024), numeral 22.2 lit. a) y Gráfico 8; banda de Tabla 8 (numeral 22.1 lit. a); categorías en Tabla 1.
  • FRTRegulación Nro. ARCONEL-001/24, ARTÍCULO 19 numeral 19.1 lit. a), Tabla 3; made applicable to category D by the opening paragraph of ARTÍCULO 22.

Any event not in the table above is not plotted for this code. Where an absence is itself the finding — a code that defines no high-voltage envelope, or one whose curves circulate under another country's name — it is recorded in the grid codes with no ride-through curve.

Last checked against the source document on .