Argentina (CAMMESA PT-4) — ride-through requirements

The FRT envelope a grid-scale battery must meet under Argentina (CAMMESA PT-4) (Argentina), digitized breakpoint by breakpoint and checked against the clause it came from.

Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.

What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.

Breakpoints

Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries.

Event Duty Breakpoints Status
frequency ride-through (FRT) ride-through High: 0.1s → 52.5 Hz; 15s → 52.5 Hz; 15.001s → 52 Hz; 25s → 52 Hz; 25.001s → 51.5 Hz; 100s → 51.5 Hz; 100.001s → 51 Hz | Low: 0.1s → 47.5 Hz; 15s → 47.5 Hz; 15.001s → 48 Hz; 25s → 48 Hz; 25.001s → 48.5 Hz; 100s → 48.5 Hz; 100.001s → 49 Hz verified

Where these values come from

  • FRT CAMMESA, LOS PROCEDIMIENTOS – P.T.4, numeral 2.2.3.2 lit. b) 'Rangos de frecuencia admisibles de operación' (Pág. 6) + 'Curva límite frecuencia-tiempo / Zona Admisible' (Pág. 7); applied to ERNC parks by ANEXO I numeral 9.8.5. Versión 03-Oct-2023.

Last checked against the source document on .

Other grid codes in South America