Colombia (CREG 060/2019, red de 500 kV) — ride-through requirements
The HVRT envelope a grid-scale battery must meet under Colombia (CREG 060/2019, red de 500 kV) (Colombia), digitized breakpoint by breakpoint and checked against the clause it came from.
Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.
What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.
Breakpoints
Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries.
| Event | Duty | Breakpoints | Status |
|---|---|---|---|
| high-voltage ride-through (HVRT) | ride-through | 0.001s → 1.2 pu; 2s → 1.2 pu; 2.001s → 1.05 pu | verified |
Where these values come from
- HVRT Resolución CREG 060 de 2019, Artículo 14 — numeral 5.7 lit. c) del Código de Operación; figura 'Característica de LVRT y HVRT para plantas eólicas y solares fotovoltaicas con conexión a nivel de 500 kV' (official graphic obj_3.gif).
Last checked against the source document on .
Other grid codes in South America
- Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1 Argentina · HVRT, LVRT
- Argentina (CAMMESA PT-4) Argentina · FRT
- Brazil (PRODIST / ONS) Brazil · FRT, HVRT, LVRT
- Chile (NTSyCS) Chile · HVRT, LVRT
- Colombia (CREG 060/2019) Colombia · HVRT, LVRT
- Ecuador (ARCONEL-001/24 Código de Conexión) Ecuador · FRT, LVRT
- Panama (Código de Redes Fotovoltaico 2017) Panama · FRT, HVRT, LVRT
- Peru (COES PR-20, Anexo 1 Cap. 4 Peru · FRT, LVRT