Quebec (Hydro-Quebec D-2022-088) — ride-through requirements

The LVRT, HVRT, FRT envelopes a grid-scale battery must meet under Quebec (Hydro-Quebec D-2022-088) (Canada), digitized breakpoint by breakpoint and checked against the clause it came from.

Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.

What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.

Breakpoints

Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries.

Event Duty Breakpoints Status
low-voltage ride-through (LVRT) ride-through 0.001s → 0 pu; 0.15s → 0 pu; 0.151s → 0.044 pu; 0.3s → 0.044 pu; 0.301s → 0.103 pu; 0.5s → 0.103 pu; 0.501s → 0.176 pu; 0.75s → 0.176 pu; 0.751s → 0.25 pu; 1s → 0.25 pu; 1.001s → 0.75 pu; 2s → 0.75 pu; 2.001s → 0.85 pu; 30s → 0.85 pu; 30.001s → 0.9 pu verified
high-voltage ride-through (HVRT) ride-through 0.001s → 1.4 pu; 0.1s → 1.4 pu; 0.101s → 1.25 pu; 2s → 1.25 pu; 2.001s → 1.2 pu; 30s → 1.2 pu; 30.001s → 1.15 pu; 300s → 1.15 pu; 300.001s → 1.1 pu verified
frequency ride-through (FRT) ride-through High: 0.1s → 61.7 Hz; 90s → 61.7 Hz; 90.001s → 61.5 Hz; 660s → 61.5 Hz; 660.001s → 60.6 Hz | Low: 0.1s → 55.5 Hz; 0.35s → 55.5 Hz; 0.351s → 56.5 Hz; 2s → 56.5 Hz; 2.001s → 57 Hz; 10s → 57 Hz; 10.001s → 57.5 Hz; 90s → 57.5 Hz; 90.001s → 58.5 Hz; 660s → 58.5 Hz; 660.001s → 59.4 Hz verified

Where these values come from

  • LVRT Hydro-Quebec TransEnergie, 'Technical Requirements for the Connection of Generating Stations to the Hydro-Quebec Transmission System', Decision D-2022-088, effective July 15, 2022; section 12.2.1, Table 8 (p.48) and Figure 6 (p.49). Verified from the Hydro-Quebec-hosted English PDF (Exigences_raccordement_centrales_ang_2022-07-15.pdf), text extracted directly.
  • HVRT Hydro-Quebec TransEnergie, 'Technical Requirements for the Connection of Generating Stations to the Hydro-Quebec Transmission System', Decision D-2022-088, effective July 15, 2022; section 12.2.2, Table 9 (p.50). Verified from the Hydro-Quebec-hosted English PDF, text extracted directly.
  • FRT Hydro-Quebec TransEnergie, 'Technical Requirements for the Connection of Generating Stations to the Hydro-Quebec Transmission System', Decision D-2022-088, effective July 15, 2022; section 12.2.3, Table 10 (p.51). Verified from the Hydro-Quebec-hosted English PDF, text extracted directly.

Last checked against the source document on .

Other grid codes in North America