Quebec (Hydro-Quebec D-2022-088) — ride-through requirements
The LVRT, HVRT, FRT envelopes a grid-scale battery must meet under Quebec (Hydro-Quebec D-2022-088) (Canada), digitized breakpoint by breakpoint and checked against the clause it came from.
Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.
What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.
Breakpoints
Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries.
| Event | Duty | Breakpoints | Status |
|---|---|---|---|
| low-voltage ride-through (LVRT) | ride-through | 0.001s → 0 pu; 0.15s → 0 pu; 0.151s → 0.044 pu; 0.3s → 0.044 pu; 0.301s → 0.103 pu; 0.5s → 0.103 pu; 0.501s → 0.176 pu; 0.75s → 0.176 pu; 0.751s → 0.25 pu; 1s → 0.25 pu; 1.001s → 0.75 pu; 2s → 0.75 pu; 2.001s → 0.85 pu; 30s → 0.85 pu; 30.001s → 0.9 pu | verified |
| high-voltage ride-through (HVRT) | ride-through | 0.001s → 1.4 pu; 0.1s → 1.4 pu; 0.101s → 1.25 pu; 2s → 1.25 pu; 2.001s → 1.2 pu; 30s → 1.2 pu; 30.001s → 1.15 pu; 300s → 1.15 pu; 300.001s → 1.1 pu | verified |
| frequency ride-through (FRT) | ride-through | High: 0.1s → 61.7 Hz; 90s → 61.7 Hz; 90.001s → 61.5 Hz; 660s → 61.5 Hz; 660.001s → 60.6 Hz | Low: 0.1s → 55.5 Hz; 0.35s → 55.5 Hz; 0.351s → 56.5 Hz; 2s → 56.5 Hz; 2.001s → 57 Hz; 10s → 57 Hz; 10.001s → 57.5 Hz; 90s → 57.5 Hz; 90.001s → 58.5 Hz; 660s → 58.5 Hz; 660.001s → 59.4 Hz | verified |
Where these values come from
- LVRT Hydro-Quebec TransEnergie, 'Technical Requirements for the Connection of Generating Stations to the Hydro-Quebec Transmission System', Decision D-2022-088, effective July 15, 2022; section 12.2.1, Table 8 (p.48) and Figure 6 (p.49). Verified from the Hydro-Quebec-hosted English PDF (Exigences_raccordement_centrales_ang_2022-07-15.pdf), text extracted directly.
- HVRT Hydro-Quebec TransEnergie, 'Technical Requirements for the Connection of Generating Stations to the Hydro-Quebec Transmission System', Decision D-2022-088, effective July 15, 2022; section 12.2.2, Table 9 (p.50). Verified from the Hydro-Quebec-hosted English PDF, text extracted directly.
- FRT Hydro-Quebec TransEnergie, 'Technical Requirements for the Connection of Generating Stations to the Hydro-Quebec Transmission System', Decision D-2022-088, effective July 15, 2022; section 12.2.3, Table 10 (p.51). Verified from the Hydro-Quebec-hosted English PDF, text extracted directly.
Last checked against the source document on .
Other grid codes in North America
- California Rule 21 US · FRT, HVRT, LVRT
- Canada (Alberta AESO) Canada · FRT, HVRT, LVRT
- ERCOT (NOG 2.6.2.1) US · FRT
- ERCOT (NOG 2.9.1.2 legacy) US · HVRT, LVRT
- ERCOT (NOG 2.9.1) US · HVRT, LVRT
- IEEE 1547-2018 Cat III US · FRT, HVRT, LVRT
- IEEE 2800-2022 US · FRT, HVRT, LVRT
- Mexico (Codigo de Red) Mexico · FRT, HVRT, LVRT
- NERC PRC-024-4 (ERCOT) US · FRT
- NERC PRC-024-4 (no-trip) US · HVRT, LVRT
- NERC PRC-024-4 (Western) US · FRT