Taiwan (TPC) — ride-through requirements
The LVRT, HVRT, FRT envelopes a grid-scale battery must meet under Taiwan (TPC) (Taiwan), digitized breakpoint by breakpoint and checked against the clause it came from.
Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.
What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.
Breakpoints
Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries.
| Event | Duty | Breakpoints | Status |
|---|---|---|---|
| low-voltage ride-through (LVRT) | ride-through | 0.001s → 0 pu; 0.15s → 0 pu; 0.151s → 0.045 pu; 0.435s → 0.135 pu; 0.72s → 0.225 pu; 1.005s → 0.315 pu; 1.29s → 0.405 pu; 1.575s → 0.495 pu; 1.86s → 0.585 pu; 2.145s → 0.675 pu; 2.43s → 0.765 pu; 2.715s → 0.855 pu; 3s → 0.9 pu | verified |
| high-voltage ride-through (HVRT) | ride-through | 0.001s → 1.2 pu; 0.25s → 1.2 pu; 0.251s → 1.15 pu; 1s → 1.15 pu; 1.001s → 1.1 pu | verified |
| frequency ride-through (FRT) | ride-through | High: 0.1s → 62 Hz; 300s → 62 Hz; 300.001s → 61.5 Hz | Low: 0.1s → 57 Hz; 20s → 57 Hz; 20.001s → 57.5 Hz; 300s → 57.5 Hz; 300.001s → 58.5 Hz | verified |
Where these values come from
- LVRT 台灣電力公司 儲能系統併聯技術要點 (issued 2020-03-06, amended 2025-09-05), clause (二)1: '電壓降低至 0 p.u. 時,持續運轉時間應至少 0.15 秒', figure 附圖二 低電壓持續運轉能力示意圖 (0 pu to 0.15 s, ramp to 0.9 pu at 3.0 s, flat thereafter). Same curve = 再生能源發電系統併聯技術要點 附圖三.
- HVRT 台灣電力公司 儲能系統併聯技術要點 (amended 2025-09-05), clause (二)2: '電壓驟升至 1.2 p.u. 時,持續運轉時間應至少 0.25 秒;電壓驟升至 1.15 p.u. 時,持續運轉時間應至少 0.75 秒' + 附圖三 高電壓持續運轉能力示意圖. Identical to 再生能源發電系統併聯技術要點 附圖四.
- FRT 台灣電力公司 儲能系統併聯技術要點, clause (十)2 高頻率持續運轉能力(HFRT): '頻率介於 61.5 至 62.0 Hz 時,持續運轉時間應至少 5 分鐘' + 附圖六 高頻率持續運轉能力示意圖 (62.0 Hz to 5 min, then 61.5 Hz). Continuous band = nominal ±2.5% (58.5-61.5 Hz), clause (十).
Last checked against the source document on .
Other grid codes in Asia-Pacific
- Australia (NER / AEMO) Australia · FRT, HVRT, LVRT
- India (CEA Connectivity Regs) India · FRT, HVRT, LVRT
- Malaysia (Grid Code Additional Code 2025) Malaysia · FRT, LVRT
- New Zealand (EIPC cl 8.25A) New Zealand · HVRT
- New Zealand North Island (EIPC cl 8.19(1)) New Zealand · FRT
- New Zealand North Island (EIPC cl 8.25A) New Zealand · LVRT
- New Zealand South Island (EIPC cl 8.25A) New Zealand · LVRT
- Philippines PV (PGC 2016 Fig 4.4) Philippines · LVRT
- Philippines VRE (PGC 2016 Tables 4.1 & 4.3) Philippines · FRT
- Philippines Wind (PGC 2016 Fig 4.2) Philippines · LVRT
- Singapore (EMA Transmission Code App. F6) Singapore · FRT
- South Korea (KEPCO) South Korea · FRT, HVRT, LVRT