Brazil (PRODIST / ONS) — ride-through requirements
The LVRT, HVRT, FRT envelopes a grid-scale battery must meet under Brazil (PRODIST / ONS) (Brazil), digitized breakpoint by breakpoint and checked against the clause it came from.
Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.
What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.
Breakpoints
Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries.
| Event | Duty | Breakpoints | Status |
|---|---|---|---|
| low-voltage ride-through (LVRT) | ride-through | 0.001s → 0.2 pu; 0.5s → 0.2 pu; 0.501s → 0.281 pu; 0.625s → 0.444 pu; 0.75s → 0.606 pu; 0.875s → 0.769 pu; 1s → 0.85 pu; 5s → 0.85 pu; 5.001s → 0.9 pu | verified |
| high-voltage ride-through (HVRT) | ride-through | 0.001s → 1.2 pu; 2.5s → 1.2 pu; 2.501s → 1.1 pu | verified |
| frequency ride-through (FRT) | ride-through | High: 0.1s → 63 Hz; 10s → 63 Hz; 10.001s → 62.5 Hz | Low: 0.1s → 56 Hz; 20s → 56 Hz; 20.001s → 58.5 Hz | verified |
Where these values come from
- LVRT ONS Procedimentos de Rede, Submodulo 3.6 'Requisitos tecnicos minimos para a conexao as instalacoes de transmissao', rev. 2019.08 - item 8.7 'Requisitos de suportabilidade a subtensoes e sobretensoes dinamicas' and Figura 5 'Tensao nos terminais dos aerogeradores ou inversores da central geradora' (0.2 pu to 0.5 s; ramp to 0.85 pu at 1.0 s; 0.85 pu to 5 s; 0.9 pu thereafter).
- HVRT ONS Submodulo 3.6 rev. 2019.08, Figura 5 - upper boundary of the 'must remain in operation' region is 1.2 pu until 2.5 s then 1.1 pu; item 8.8 confirms additional reactive-current ABSORPTION is required for voltages above 110%, i.e. the plant is expected to remain connected above 1.1 pu.
- FRT ONS Submodulo 3.6 rev. 2019.08, Quadro 6 'Requisitos tecnicos gerais' item 1 (Operacao em regime de frequencia nao nominal): (c) 'Operacao entre 58,5 e 62,5 Hz por tempo ilimitado'; (d) 'Operacao acima de 62,5 Hz por periodo de tempo minimo de 10 segundos'; (e) 'Desligamento instantaneo permitido para operacao acima de 63 Hz'.
Last checked against the source document on .
Other grid codes in South America
- Argentina (CAMMESA PT-4 Anexo I, Fig. Ai.1 Argentina · HVRT, LVRT
- Argentina (CAMMESA PT-4) Argentina · FRT
- Chile (NTSyCS) Chile · HVRT, LVRT
- Colombia (CREG 060/2019, red de 500 kV) Colombia · HVRT
- Colombia (CREG 060/2019) Colombia · HVRT, LVRT
- Ecuador (ARCONEL-001/24 Código de Conexión) Ecuador · FRT, LVRT
- Panama (Código de Redes Fotovoltaico 2017) Panama · FRT, HVRT, LVRT
- Peru (COES PR-20, Anexo 1 Cap. 4 Peru · FRT, LVRT