Sri Lanka (CEB) — ride-through requirements

The LVRT, FRT envelopes a grid-scale battery must meet under Sri Lanka (CEB), digitized breakpoint by breakpoint and checked against the clause it came from.

Applies to: transmission connections — Generators connecting to the CEB transmission grid.

Part of: the grid-code ride-through chart — compare this against 65 other standards in 44 countries.

What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.

Breakpoints

Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries. These are the boundaries, not the behaviour: what holding one demands of the converter — reactive current injection, thermal stress, protection timing — is stepped through in the LVRT / HVRT ride-through visual.

EventDutyBreakpointsStatus
low-voltage ride-through (LVRT)ride-through0.001s → 0 pu; 0.14s → 0 pu; ↗ 1.2s → 0.8 pu; 2.5s → 0.8 pu; 2.501s → 0.85 pu; 180s → 0.85 pu; 180.001s → 0.9 pu; 600s → 0.9 puverified
frequency ride-through (FRT)ride-throughHigh: 0.1s → 53 Hz; 20s → 53 Hz; 20.001s → 52 Hz; 1200s → 52 Hz; 1200.001s → 51.5 Hz; 5400s → 51.5 Hz; 5400.001s → 51 Hz | Low: 0.1s → 47 Hz; 60s → 47 Hz; 60.001s → 47.5 Hz; 5400s → 47.5 Hz; 5400.001s → 49 Hzverified

Where these values come from

  • LVRTCeylon Electricity Board, Grid Connection Code, Grid Code - Revised September 2023 (PDF published July 2024, ceb.lk '1723552921Grid_Connection_Code_for_publishing_in_CEB_web.pdf'), section 3.17.3 'Fault Ride Through / Low Voltage Fault Ride Through (LVRT)', Figure 3.17-10 'Fault Ride Through requirement - Voltage duration curve' (p.32). The code defines a linear recovery ramp; the vertices are read from the clause and the chart draws the segment between them.
  • FRTCEB Grid Connection Code, Grid Code - Revised September 2023 (published July 2024), section 3.17.1.1 'Frequency ranges' I. Operating ranges (b), table on p.20.

Any event not in the table above is not plotted for this code. Where an absence is itself the finding — a code that defines no high-voltage envelope, or one whose curves circulate under another country's name — it is recorded in the grid codes with no ride-through curve.

Last checked against the source document on .

How Sri Lanka compares

Each event this code defines, put side by side with every other code that defines it:

Other grid codes in Asia-Pacific