Switzerland (Swissgrid TC-CH 2019) — ride-through requirements
The FRT envelope a grid-scale battery must meet under Switzerland (Swissgrid TC-CH 2019) (Switzerland), digitized breakpoint by breakpoint and checked against the clause it came from.
Part of: the grid-code ride-through chart — compare this against 63 other standards in 42 countries.
What this is, and is not. A reading aid compiled from the clause cited below — not a compliance document. The primary text governs. Every value here was read from a current primary source.
Breakpoints
Times are seconds from the start of the disturbance. Voltage is per-unit of nominal; frequency in hertz. An LVRT curve is a lower boundary (stay connected while voltage is on or above it), an HVRT curve an upper boundary, and FRT gives the band between its High and Low boundaries.
| Event | Duty | Breakpoints | Status |
|---|---|---|---|
| frequency ride-through (FRT) | ride-through | High: 0.1s → 51.5 Hz; 1800s → 51.5 Hz; 1800s → 51 Hz | Low: 0.1s → 47.5 Hz; 1800s → 47.5 Hz; 1800s → 49 Hz | verified |
Where these values come from
- FRT Swissgrid / VSE, 'Transmission Code 2019 (TC-CH)', section 6.5.2, Figure 12 'Robustness against frequency or voltage fluctuations' (p. 47) and paragraph 6.5.2(7) - NOT section 6.5.4; corroborated for storage by Swissgrid CESS minimum requirements v1.1 (29.05.2026), section 4.1, Figure 6.
Last checked against the source document on .
Other grid codes in Europe
- Austria (E-Control TOR Typ D) Austria · FRT, LVRT
- Belgium (Federal Grid Code) Belgium · FRT, LVRT
- Denmark (TR 3.3.1) Denmark · FRT, LVRT
- Finland (Fingrid VJV2024) Finland · FRT, HVRT, LVRT
- France (RTE) France · LVRT
- Greece (ADMIE/IPTO RfG) Greece · FRT, LVRT
- Ireland (EirGrid) Ireland · LVRT
- Italy (TERNA) Italy · HVRT, LVRT
- Netherlands (TenneT) Netherlands · LVRT
- Norway (Statnett NVF 2025) Norway · FRT, LVRT
- Poland (PSE Wymogi 2025) Poland · LVRT
- Romania (Transelectrica/ANRE storage norm) Romania · FRT, LVRT